Refurbishment of Precision Engineering Facility

By Glenside, Reading.

Berkshire

20 weeks

14,000 sq ft

Aerocomponents Ltd

A new start for Aerocomponents.

With a recent change of ownership, Precision Engineers Aerocomponents were on a mission to regenerate the business, including a complete refurbishment of their premises.


The interior of the building housed their factory, office and welfare spaces which had barely been improved since the 1980s. This was affecting client perception and staff morale and needed to align with the forward-looking image and requirements of the company.


Watch our video to see more:

A new start for Aerocomponents.

With a recent change of ownership, Precision Engineers Aerocomponents were on a mission to regenerate the business, including a complete refurbishment of their premises.


The interior of the building housed their factory, office and welfare spaces which had barely been improved since the 1980s. This was affecting client perception and staff morale and needed to align with the forward-looking image and requirements of the company.


Watch our video to see more:

A new start for Aerocomponents.

With a recent change of ownership, Precision Engineers Aerocomponents were on a mission to regenerate the business, including a complete refurbishment of their premises.


The interior of the building housed their factory, office and welfare spaces which had barely been improved since the 1980s. This was affecting client perception and staff morale and needed to align with the forward-looking image and requirements of the company.

Watch the video below to see more:

Back to basics.

We were selected as Aerocomponents’ partner for the project, based on expertise, experience and integrity, which quickly became evident to the decision makers.


The process began with an in-depth analysis of the current and future requirements of the company, alongside surveys of the building interior, which came together in our generation of concept designs and budgets. From this base, we collaborated to develop a detailed design scheme and comprehensive specification.

Back to basics.

We were selected as Aerocomponents’ partner for the project, based on expertise, experience and integrity which quickly became evident to the decision makers.


The process began with an in-depth analysis of the current and future requirements of the company, alongside surveys of the building interior, which came together in our generation of concept designs and budgets. From this base, we collaborated to develop a detailed design scheme and comprehensive specification.

Back to basics.

We were selected as Aerocomponents’ partner for the project, based on expertise, experience and integrity which quickly became evident to the decision makers.


The process began with an in-depth analysis of the current and future requirements of the company, alongside surveys of the building interior, which came together in our generation of concept designs and budgets. From this base, we collaborated to develop a detailed design scheme and comprehensive specification.

From the rough to the smooth.

Within this project, our scope of work was very varied and wide ranging. It included heavier items of work such as adjusting steelwork on an existing mezzanine, creating new stairs and replacing industrial doors through to refined touches such bespoke feature signage, laboratory-grade spaces and furniture.


The co-ordination of this breadth of scope at both design and construction stage allowed our abilities to shine.

Turnkey service.

Glenside’s scope included:



  • Concept and detailed design
  • Space planning
  • Structural design
  • Mechanical and electrical design
  • Local authority planning permission
  • Management of Building Regulations compliance and certification
  • Assistance with landlord approvals / Licence to Alter
  • Interior design including assistance with selection of finishes
  • Mezzanine alterations
  • Staircase design, supply and installation
  • Partitioning including glazing
  • New roller shutter and other external doors
  • Ceilings, decoration and a variety of flooring
  • Heating, ventilation and air conditioning (HVAC) works
  • Electrical and data installations
  • Washroom alterations and refurbishments
  • New teapoints and changing facilities
  • Fire and security systems
  • Supply and installation of furniture
  • Bespoke internal and external signage


Precision fulfilment.

Aerocomponents’ operations needed to continue to run at full capacity throughout the works. Through careful planning, positive working relationships and detailed collaboration, the project was achieved on programme and without significant disruption to the client’s productivity.


This involved numerous phases of work, with relocations of equipment between these. Mid-project changes to the client’s brief were accommodated without significant impact to cost or programme.

From the rough to the smooth.

Within this project, our scope of work was very wide ranging. It included heavier items of work such as adjusting steelwork on an existing mezzanine, creating new stairs and replacing industrial doors, through to refined touches such bespoke feature signage, laboratory-grade spaces and furniture.


The co-ordination of this breadth of scope at both design and construction stage allowed our abilities to shine.

Turnkey service.

Glenside’s scope included:



  • Concept and detailed design
  • Space planning
  • Structural design
  • Mechanical and electrical design
  • Local authority planning permission
  • Management of Building Regulations compliance and certification
  • Assistance with landlord approvals / Licence to Alter
  • Interior design including assistance with selection of finishes
  • Mezzanine alterations
  • Staircase design, supply and installation
  • Partitioning including glazing
  • New roller shutter and other external doors
  • Ceilings, decoration and a variety of flooring
  • Heating, ventilation and air conditioning (HVAC) works
  • Electrical and data installations
  • Washroom alterations and refurbishments
  • New teapoints and changing facilities
  • Fire and security systems
  • Supply and installation of furniture
  • Bespoke internal and external signage

Precision fulfilment.

Aerocomponents’ operations needed to continue to run at full capacity throughout the works. Through careful planning, positive working relationships and detailed collaboration, the project was achieved on programme and without significant disruption to the client’s productivity. 


This involved numerous phases of work, with relocations of equipment between these. Mid-project changes to the client’s brief were accommodated without significant impact to cost or programme.

The results.

The feedback from Aerocomponents and their stakeholders has been excellent. See the achievements and hear the comments from Simon Rose, MD, on the video link below.

Project Video

From the rough to the smooth.

Within this project, our scope of work was very varied and wide ranging. It included heavier items of work such as adjusting steelwork on an existing mezzanine, creating new stairs and replacing industrial doors through to refined touches such bespoke feature signage, laboratory-grade spaces and furniture.


The co-ordination of this breadth of scope at both design and construction stage allowed our abilities to shine.

Turnkey service.

Glenside’s scope included:



  • Concept and detailed design
  • Space planning
  • Structural design
  • Mechanical and electrical design
  • Local authority planning permission
  • Management of Building Regulations compliance and certification
  • Assistance with landlord approvals / Licence to Alter
  • Interior design including assistance with selection of finishes
  • Mezzanine alterations
  • Staircase design, supply and installation
  • Partitioning including glazing
  • New roller shutter and other external doors
  • Ceilings, decoration and a variety of flooring
  • Heating, ventilation and air conditioning (HVAC) works
  • Electrical and data installations
  • Washroom alterations and refurbishments
  • New teapoints and changing facilities
  • Fire and security systems
  • Supply and installation of furniture
  • Bespoke internal and external signage


Precision fulfilment.

Aerocomponents’ operations needed to continue to run at full capacity throughout the works. Through careful planning, positive working relationships and detailed collaboration, the project was achieved on programme and without significant disruption to the client’s productivity. 


This involved numerous phases of work, with relocations of equipment between these. Mid-project changes to the client’s brief were accommodated without significant impact to cost or programme.

The results.

The feedback from Aerocomponents and their stakeholders has been excellent. See the achievements and hear the comments from Simon Rose, MD, on the video link below.

Video Project

Before & After.

A large warehouse filled with lots of boxes and a fire extinguisher.
There is a large screen in the middle of the room.

From an 1980 factory to a fresh engineering space.

More of our projects:

  • A large industrial space with shelving units and stairs leading to a mezzanine floor
  • Get in touch.

    A woman is walking through a lobby with a welcome sign on the wall.

    For more details on how we can help or to book a consultation at our showroom, please call us on 0118 214 7890 or fill out the form and we will get back to you soon.

    Contact Us

    Share by: